Day 1
The first day consisted of the crew filming the entire house and interviewing Martin and Leonor. My dad supervised all activities from the office. Prior to the first day of filming my dad and I raised portion of the kitchen floor (the section where the fridge is loacted). Also we changed out 2 large windows for shorter ones where you see the wine cooler. Click on the individual photo to get a larger view. |
setting up for filming |
interview in the bedroom |
Leonor and her mom cooking one last time in the old kitchen |
Martins dad Billy watching from the office |
|
Day 2
Now it was finally time to get all the old cabinets and counters out of the kitchen. Leonor's sister Angie lend us a helping hand.
Click on the individual photo to get a larger view. |
out with the old cabinets |
right side |
left side |
setting up a shot |
monitoring the filming |
producer reviewing shots |
Angie and Martin |
cluttering up the garage |
results of cabinet demolition |
results of cabinet demolition |
results of cabinet demolition |
assist. producer and Leonor |
|
Day 3
After demolition was complete, we had a contractor come in and cut a window in to the wall, install new gas lines and reroute the hot, cold and wastewater pipes.
Click on the individual photo to get a larger view. |
wall between kitchen and living room |
wall from kitchen |
same wall from living room |
window added to wall |
new plumbing for sink |
kneewall on entrance |
finished wall |
finished wall |
|
Day 4
My dad came back up and helped us install the cement board as a subfloor for the new tiles. We then proceeded to lay down the tiles wich took about 2 days. Click on the individual photo to get a larger view. |
Martin and dad laying down backer board |
Martin and dad laying down backer board |
Martin and dad laying down backer board |
Martin and dad laying down backer board |
Martin and dad laying starting to tile |
Martin tiling some more |
... and more |
.. and more |
|
Day 5
After Martin finished laying the tiles over a few evenings, Billy finished the job by grouting for most of the day.
Click on the individual photo to get a larger view. |
Billy grouting the entire floor |
|
Day 6
With the new floor completed, Martin painted the wall in this new "Appalachian Tail" color. Most of it wil be covered by the new cabinets. He also installed new recessed lighting, replacing the fluoresent fixtures we had before.
Click on the individual photo to get a larger view. |
filming paint dry |
Appalachian trail paint color |
first coat of paint |
the final color scheme |
|
Day 7
Again Angie stopped by to help us to finish assembly of all cabinets. Martin and Leonor already assmebled most cabinets in the days prior to installation. After leveling and securing all base cabinets we had a contractor install Ubatuba granite on all countertop surfaces. Finishing tasks such as painting the trim molding, cabinet hardware installation and the hook up of the new dishwasher took another day. We also installed a new microwave over the stove. Click on the individual photo to get a larger view. |
the film crew setting up for outside shoots |
the film crew setting up for outside shoots |
Leonor sister Angie arriving to help |
Martin assembling the last cabinets |
Leonor, Angie and Martin after final installation |
Leonor repainting the trim |
Leonor working hard |
|
Before/After
Here are a few pictures to compare the old kitchen with the new and very much improved kitchen.
Click on the individual photo to get a larger view. |
Entrance before Entrance After |
Pantry before Pantry after |
Window corner before
Window corner after |
Floors before
Floors after |
Sink before
Sink after |
Stove before
Stove after |
Cabinet detail |
Sink and dishwasher |
Overhead glass cabinets |
New Pantry |
New cabinets |
New kitchen |
To return to mamuco.com click here.
|